The site was leased from 1925-2003 to industrial tenants including a manufacturer of asphaltic membranes and mixtures. Chemicals used at the operation include alcohols, solvents, pesticides, and petroleum hydrocarbon products. In 2003 the site was vacated, and all structures where removed. The challenge was three target intervals including silty clay sandwiched between coarse grained soils.
DOWNLOAD THE RESULTS OF THIS REMEDIATION PROJECT IN THE PDF BELOW